A SHARED RISK & REWARD APPROACH
TO DELIVERING SAVINGS
Quick Facts
Manufacture for the global market
Polystyrene, pressing, coating and packaging lines
Compressed air savings of 34%
Tendered £300k of capital projects
Modelling of shift and manufacturing changes
834
Tons CO2
Savings Identified
£250k
Energy Savings
Delivered
Background
Initially engaged over 10 years ago to help with CCA management, we have gone on to assist with CRC, ISO 50001, energy procurement and ESOS within the group spanning the whole of the UK and Ireland. With the client equally focused on delivering kWh savings, we have been working in partnership to deliver energy cost reduction through capital projects.
Challenge
As with most manufacturing sites, energy efficiency is not normally considered a key function within the business. The challenge for us was to alter the mindset of site personnel through behavioural change, making them aware of the overall impact of energy on the business and simple measures they could implement to drive improvement in energy efficiency, thus improving company profitability. It is important that Capital projects meet rigorous payback criteria, and all projects can be implemented without having a negative impact on production operation or output.
Solution
Our engineers carried out an initial investment grade feasibility study to identify and quantify projects that met the Board’s investment criteria. We then worked with our network of technology specialists to draft detailed project specifications, carry out competitive tenders, and work with contractors to deliver solutions. As part of this we installed a comprehensive M&T system, capturing circuit level data on a 5-min basis which is now being used to identify energy wastage and drive behavioural change across the site.
Results
The output of our analysis and project identification has resulted in the delivery of 15 projects within the past 12 months, and a savings projection of £250,000 for 2018. All projects are measured and verified according to International Performance Measurement and Verification Protocol (IPMVP). The site now has full visibility of its energy costs at circuit level and this is also being used to drive improvement in budgeting and forecasting within their finance dept.
At Optimised Energy we take a strategic approach to solving our clients’ challenges. Our consultant engineers conduct detailed feasibility studies in order to understand people, processes and technology within our client’s environments, before designing and implementing solutions that are focused on delivering outcomes. This approach ensures that we deploy a multi-disciplinary team of engineers and analysts with the best of breed technology to address our clients’ needs, be that cost saving, process efficiency or risk management.